Service — Flooring

Flooring — VCT, LVT, Carpet, Tile & Hardwood Refinish

From moisture testing and subfloor prep to clean installs and punch-list closeout. We phase work around your operation and protect finished areas so you can keep moving.

Moisture Testing Subfloor Prep Clean Phasing Punch-List Closeout

Surface Prep & Testing

RH/CaCl moisture tests, leveling/patch, skim coats and trowel techniques that match the specified adhesive and material.

Installations & Finishes

VCT/LVT, carpet tile/broadloom, ceramic/porcelain tile and hardwood refinish with clear transitions and base.

Protection & Closeout

Protection boards and cones, daily cleanups, labeled attic stock and documented punch-list completion.

Scope

What’s included

We tailor scope by substrate, manufacturer requirements and your schedule. Below is our standard coverage.

Subfloor & Moisture

  • Moisture tests (RH or CaCl) as required by spec
  • Self-leveling/patch; skim coats for smoothness
  • Removal of loose adhesive and contaminants
  • Crack isolation and feather finish where needed

Materials

  • VCT/LVT: layout, adhesive trowel size, rolling
  • Carpet: tile or broadloom, seams, transitions
  • Tile: layout, thinset/large-format handling, grout
  • Hardwood: sand, stain, finish (site conditions apply)

Transitions & Base

  • Reducers, T-moldings, nosings per doorways and stairs
  • Rubber/vinyl base (straight or cove) as specified
  • Thresholds aligned with ADA and manufacturer guidance
  • Color/height matched to adjacent floors

Protection & Logistics

  • Protection boards & cones to keep traffic clear
  • Phased areas with daily broom/vac cleanups
  • Material acclimation and temperature control
  • Waste removal and tidy staging zones

Compliance & Docs

  • Manufacturer install methods followed
  • MSDS/SDS on site; low-VOC options on request
  • Photo documentation as requested
  • Attic stock labeled (color, lot, location)

Options

  • Moisture mitigation systems (per test results)
  • Furniture moves and lift-system for carpet tile
  • Night/Weekend work to avoid downtime
  • Cove base with outside/inside pre-mitered corners
Industries

Floors that fit your use

We align materials and phasing with traffic, cleaning methods and brand standards.

🏢

Offices & Campuses

LVT and carpet tile that handle wheels and rolling loads.

🏬

Retail & Banks

Durable, cleanable surfaces with consistent color lots.

🏥

Healthcare & Dental

Seams and transitions planned for carts and infection control.

🏫

Private Schools

Low-VOC options and school-calendar scheduling.

🏘️

Multi-family

Fast unit turns; colorways that minimize future mismatch.

🏠

Residential

Hardwood refinish and tile with dust control and clean sites.

Process

Test, prepare, install, protect

Assessment & Testing

Substrate review, moisture tests and layout. Options presented if mitigation is required.

Prep & Scheduling

Level/patch and acclimate materials. We phase areas around your hours to maintain access.

Installation

Manufacturer-approved methods, correct trowels/rollers and clean seam work. Base and transitions installed.

Protection & Closeout

Protection boards, daily cleanup, punch-list completion and labeled attic stock.

Plans

Typical packages (customizable)

We quote by room/site with options for protection, moves and after-hours.

Package Use case Includes Options
Basic Refresh Small office/room, minimal prep LVT or carpet tile install, basic patch, base & transitions Furniture moves, after-hours
Standard Replace Suite or multi-room Removal, leveling/patch, new floor, base, transitions, protection Moisture testing, mitigation if needed
Premium Renovation High visibility or heavy traffic Enhanced prep, upgraded materials, protection boards, phased install Night/Weekend work, attic stock, extended documentation

Note: Final scope depends on substrate condition, moisture results, furniture/moves, and manufacturer requirements.

Photos

Recent work

Real results from our flooring (vct, lvt, carpet, tile & hardwood) projects.

FAQ

Flooring: Common questions

Do you perform moisture testing?
Yes. We can run RH (in-slab) or CaCl (surface) tests per manufacturer requirements. If results are high, we’ll propose mitigation.
Can you work after hours and in phases?
Absolutely. We phase areas and schedule nights/weekends so your operation stays open and safe while work progresses.
Who moves furniture or cubicles?
We can include furniture moves/lift-system in our scope, or coordinate with your mover. We’ll plan a layout to minimize downtime.
Do you handle asbestos (old VAT/mastic)?
Suspected asbestos must be handled by licensed abatement contractors. We can coordinate third-party testing/abatement before our work.
What about odors and VOCs?
We can specify low-VOC adhesives/finishes and add ventilation plans for sensitive sites like schools and healthcare.

Ready to plan your flooring project?

Send photos, square footage and any known substrate issues. We’ll reply with options, schedule and a clean plan for protection.