After-hours panel change-out, dedicated circuits and labeling with inspections coordinated and minimal downtime.
Tech office adding IT and HVAC loads.
Load calc, panel schedule, AHJ permit and inspection timing.
LOTO, change-over, new circuits and labeling with QA.
Inspection passed; as-built photos and updated directory.
Capacity increased; minimal outage time; clear circuit directory.
Electrical (licensed), Handyman (patch/trim as needed).
LOTO, insulated tools, meter-tested verification; zero incidents.